This week’s updates from the Wisconsin Department of Transportation (WisDOT) on road construction projects for Barron, Burnett, Polk, Rusk, Sawyer, and Washburn counties.
Barron County
Highway: US 53
- Location: 26th Avenue north of Rice Lake to Pine Grove Road south of Sarona
- Schedule: Sept. 5 to October 2024
- Cost: $21.89 million
- Description: Removing the existing and base course, placing a new base aggregate layer for drainage, replacing the pavement, rebuilding intersection approaches and installing cable barrier in the median between 26th and 27th avenues and a friction surface on the pavement in the same area to reduce crossover crashes.
- Traffic impacts: Motorists will encounter single-lane closures, and the speed limit will be reduced to 55 mph when lanes are closed.
Burnett County
Highway: WIS 70
- Location: St. Croix River Bridge west of Grantsburg
- Schedule: June 21 to October
- Cost: $1.25 million
- Description: Overlaying the bridge deck with concrete, making concrete structure repairs, repairing bridge joints, placing a polymer overlay on the sidewalk and replacing missing riprap, guardrail and approach pavement.
- Traffic impacts: None; project complete.
Polk County
Highway: County K
- Location: Branch Wapogasset River Bridge west of Amery
- Schedule: Sept. 12 to November
- Cost: $595,977
- Description: Replacing the bridge.
- Traffic impacts: County K is closed from WIS 65 to County P, and traffic is being detoured via WIS 65, County F and County P.
Rusk County
Highway: US 8
- Location: Old 8 Road/East 16th Street North in Ladysmith east to the Price County line
- Schedule: Aug. 21 to October
- Cost: $1.73 million
- Description: Replacing 35 culvert pipes and abandoning two more; repairing or replacing wing walls on three box culverts; replacing pavement above culvert work and guardrail; and placing new pavement markings.
- Traffic impacts: Motorists will encounter lane closures controlled by flagging and temporary signals.
Sawyer County
- No current projects
Washburn County
Highway: WIS 70
- Location: Yellow River culvert east of the city of Spooner
- Schedule: Aug. 7 to October
- Cost: $1.13 million
- Description: Removing the existing culvert, constructing a bridge, replacing the pavement on both sides of the structure and placing new pavement markings and signage.
- Traffic: The road is closed, with traffic detoured via US 53 and US 63.
Highway: US 53
- Location: Pine Grove Road southeast of Shell Lake to Wildcat Road southeast of Spooner
- Schedule: Aug. 15, 2022, to October 2023
- Cost: $16.8 million
- Description: Removing the existing pavement and a portion of the existing base course; placing a new base aggregate layer for drainage and new concrete pavement; replacing storm sewer, culverts, curb and gutter; reconstructing the approaches to US 53 from existing intersections; replacing shoulder rumble strips; and placing pavement markings.
- Traffic impacts: Motorists will encounter single-lane closures in both directions.
Highway: US 53
- Location: 26th Avenue north of Rice Lake to Pine Grove Road south of Sarona
- Schedule: Sept. 5 to October 2024
- Cost: $21.89 million
- Description: Removing the existing and base course, placing a new base aggregate layer for drainage, replacing the pavement, rebuilding intersection approaches and installing cable barrier in the median between 26th and 27th avenues and a friction surface on the pavement in the same area to reduce crossover crashes.
- Traffic impacts: Motorists will encounter single-lane closures, and the speed limit will be reduced to 55 mph when lanes are closed.
Last Update: Oct 20, 2023 12:10 pm CDT