This week’s updates from the Wisconsin Department of Transportation (WisDOT) on road construction projects for Barron, Burnett, Polk, Rusk, Sawyer, and Washburn counties.
Northwest Region Pavement Marking
Highway: Various
Location: Various
Schedule: May 17 to October
Cost: $1.04 million
Description: Completing longline marking of centerlines and edge lines and special marking of words, arrows, stop bars, diagonals, curbs and crosswalks.
Traffic impacts: Moving lane restrictions are anticipated in:
- Barron County: US 8 from County O southeast of Barron to the south junction of County SS in Cameron.
- Washburn County: US 63 from the Barron-Washburn County line to County B East.
Burnett County
Highway: WIS 70
Location: Fosmo and West Hertel drives in the town of La Follette
Schedule: June 21 to early July
Cost: $279,652
Description: Widening the shoulders from 3 to 5 feet and adding shoulder rumble strips.
Traffic impacts: Motorists should expect single-lane closures controlled by daytime flagging operations along with shoulder closures.
Polk County
Highway: WIS 46 (Keller Avenue)
Location: Snow Street to the York Park entrance, city of Amery
Schedule: May 3 to September
Cost: $1.87 million
Description: Resurfacing WIS 46, reducing the number of traffic lanes to one in each direction with a two-way left-turn lane in the center by adding new lane markings, upgrading traffic signal systems at the intersections of Broadway Street East (County F) and Birch Street to current standards and replacing curb ramps throughout the project limits.
Traffic impacts:
- WIS 46 is closed from Broadway Street East (County F) to Hyland Street for a city reconstruction project.
- Detour: WIS 46, US 63 and US 8.
Rusk County
Highway: County B
Location: Middle Fork Main Creek Bridge south of Glen Flora
Schedule: June 14 to late August
Cost: $436,995
Description: Replacing the bridge.
Traffic impacts: County B is closed at the project site.
Highway: County G
Location: Jump River Bridge west of Sheldon
Schedule: April 26 to July
Cost: $964,538
Description: Redecking the bridge.
Traffic impacts: County G is closed at the project site.
Washburn County
Highway: US 53
Location: US 53/WIS 77 intersection in Minong
Schedule: May 3 to late July
Cost: $1.25 million
Description: Reconstructing the existing US 53/WIS 77 intersection as a J-turn, an intersection that reduces conflict points that can lead to crashes at crossings by rerouting left-turning and through traffic from the side road.
Traffic impacts: US 53 is reduced to one lane in each direction.
Highway: US 53
Location: Between Mackey and Ross roads in the town of Trego
Schedule: March 17, 2021 – November 2022
Cost: $17.65 million
Description: Reconstructing US 53 from Mackey Road to existing US 63, relocating US 63 to closely follow the existing Wild River State Trail and constructing a new grade separated interchange connecting US 53 with realigned US 63, new west frontage road from Mackey Road to County E and turn lanes along US 53 at existing intersections, including Mackey, O’Brien and Ross roads.
Traffic impacts:
- US 53 is reduced to a single lane in both directions, and the speed limit has been reduced from 65 mph to 55 mph.
- Temporary signals are in operation at the US 53 intersections at County E/Oak Hill Road and US 63 Liesch Road.
- US 63 lanes are restricted to 13 feet, and the speed limit has been reduced from 55 mph to 45 mph.
- A portion of the Wild Rivers State Trail is being detoured.
Last Update: Jun 28, 2021 8:44 am CDT