Loading...
Loading...

Northwest WI Regional Weekly Construction Update

This week's construction update for our area counties from the Wisconsin Department of Transportation

Northwest WI Regional Weekly Construction Update

Northwest Region Construction Update

The Wisconsin Department of Transportation (WisDOT) provides weekly updates on road construction projects in the following counties in northwest Wisconsin: Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, St. Croix, Sawyer, Taylor, Trempealeau and Washburn counties.

Northwest Region Pavement Marking

Highway: Various

Location: Ashland, Buffalo, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, St. Croix, Taylor, Trempealeau and Washburn counties

Schedule: May 17 to October

Cost: $1.04 million

Description: Completing longline marking of centerlines and edge lines and special marking of words, arrows, stop bars, diagonals, curbs and crosswalks.


Polk County

Highway: WIS 46 (Keller Avenue)

Location: Snow Street to the York Park entrance, city of Amery

Schedule: May 3 to September

Cost: $1.87 million

Description: Resurfacing WIS 46, reducing the number of traffic lanes to one in each direction with a two-way left-turn lane in the center by adding new lane markings, upgrading traffic signal systems at the intersections of Broadway Street East (County F) and Birch Street to current standards and replacing curb ramps throughout the project limits.

Traffic impacts:

  • WIS 46 is reduced to one lane in each direction from Griffin Street to Wisconsin Avenue.
  • WIS 46 is closed from Broadway Street East (County F) to Hyland Street for a city reconstruction project.
    • Detour: WIS 46, US 63 and US 8.

Rusk County

Highway: County G

Location: Jump River Bridge west of Sheldon

Schedule: April 26 to July

Cost: $964,538

Description: Redecking the bridge.

Traffic impacts: County G is closed at the project site.


Washburn County

Highway: US 53

Location: US 53/WIS 77 intersection in Minong

Schedule: May 3 to late July

Cost: $1.25 million

Description: Reconstructing the existing US 53/WIS 77 intersection as a J-turn, an intersection that reduces conflict points that can lead to crashes at crossings by rerouting left-turning and through traffic from the side road.

Traffic impacts: US 53 will be reduced to one lane in each direction.


Washburn County

Highway: US 53

Location: Between Mackey and Ross roads in the town of Trego

Schedule: March 17, 2021 – November 2022

Cost: $17.65 million

Description: Reconstructing US 53 from Mackey Road to existing US 63, relocating US 63 to closely follow the existing Wild River State Trail and constructing a new grade separated interchange connecting US 53 with realigned US 63, new west frontage road from Mackey Road to County E and turn lanes along US 53 at existing intersections, including Mackey, O’Brien and Ross roads.

Traffic impacts:

  • US 53 is reduced to a single lane in both directions, and the speed limit has been reduced from 65 mph to 55 mph.
  • North- and southbound US 63 lanes are restricted to 13 feet, and the speed limit has been reduced from 55 mph to 45 mph.
  • A portion of the Wild Rivers State Trail is being detoured.

Last Update: Jun 07, 2021 12:20 pm CDT

Posted In

Outdoors

Share This Article

Loading...
Loading...
Loading...